DP Electric partnered with the City of Scottsdale to deliver critical electrical upgrades for the CAP Plant #3 Chemical Area Improvements project. The scope included the demolition and replacement of existing conduit and conductors, installation of NEMA 4 disconnects mounted on stainless steel stands designed to withstand corrosive environments, and complete wiring and termination of instrumentation and control devices.
Our team also performed RTU and PLC panel terminations, followed by comprehensive system startup and testing to ensure reliable operation. These improvements support the plant’s ability to safely and efficiently manage chemical processes while enhancing the durability and performance of the facility’s electrical infrastructure.