DP Electric collaborated with PCL Construction to install and upgrade the New Lower Lift Station, Upper Lift Station, and Wastewater Treatment Plant (WWTP). The project also included the installation of power and control systems, along with duct banks throughout the park.
Location
Patagonia, AZ
Owner
Patagonia State Park
General Contractor
PCL Construction