DP Electric partnered with Filanc Construction to install new PVC coated conduit and SS Supports to power and control the new flow transmitters. After installing power and control conductors, modifications were made inside the existing PLC cabinet to provide a fully functioning system.
Location
Phoenix AZ
Owner
City of Phoenix
General Contractor
Filanc Construction
Size (sf)
Confidential