DP Electric partnered with Filanc Construction to do a complete demolition of the existing Ferric and Caustic Pump system. We installed new PVC coated conduits from the existing power panels and PLC’s. After installing new control and analog cables on existing I/O points we were able to deliver this project on schedule.
Location
Phoenix AZ
Owner
City of Phoenix
General Contractor
Filanc Construction
Size (sf)
Confidential