Chandler Tank Rehab

DP Electric partnered with PCL Construction and the City of Chandler installing over 2,000 feet of Galvanized Rigid Conduit to provide new power and controls to the Chandler tank. The project included new Intrusion Switches, a Level Transducer, and a Mixer, followed by terminations, calibrations, labeling, and system checks. With these upgrades, the Chandler tank is now fully operational with modernized infrastructure.

Location

Chandler, AZ

Owner

City of Chandler

General Contractor

PCL Construction

Size (sf)

Scroll to Top