San Tan Recharge

Categories: Water & Wastewater Treatment

Aerial view of a suburban area featuring a large building under construction, surrounded by residential houses, a pond, a road, and green spaces.

San Tan Recharge

With our power, control, and analog duct banks, the new Injection Wells will have a full Auto-Function. Our team modified the existing PLC to accommodate the new level elements, flow meters, and MOVs. While the new equipment rack supplied power throughout the site.  Location San Tan AZ Owner EPCOR General Contractor Currier Construction Size (sf)

Read More »
A long industrial metal walkway with overhead pipes, electrical cables, and equipment on the left, and concrete walls on both sides, leading to a distant, well-lit area.

Union Hills Insertion Flow Meters

DP Electric partnered with Filanc Construction to install new PVC coated conduit and SS Supports to power and control the new flow transmitters. After installing power and control conductors, modifications were made inside the existing PLC cabinet to provide a fully functioning system.  Location Phoenix AZ Owner City of Phoenix General Contractor Filanc Construction  Size

Read More »
A well-lit industrial facility with various pipes, valves, and control panels lining the walls and a walkway down the center.

Union Hills Ferric and Caustic

DP Electric partnered with Filanc Construction to do a complete demolition of the existing Ferric and Caustic Pump system. We installed new PVC coated conduits from the existing power panels and PLC’s. After installing new control and analog cables on existing I/O points we were able to deliver this project on schedule.  Location Phoenix AZ

Read More »