Ping, inc.

Phoenix, Arizona

Project Description
D.P. Electric was brought on board by DPR Construction as a design-build partner to perform the electrical installation of two new carport/shade structure PV systems at the PING, Inc. Headquarters. D.P. Electric worked in conjunction with DPR Construction, Green Choice Solar & McGrew Engineering to design & install the system. Replacing and upgrading the PV system’s existing distribution gear required careful coordination of shutdowns to limit the impact to manufacturing and production at the PING facility.

Size:  200+50 kW
Owner:
 
PING, Inc.
Contractor: 
DPR Construction | Green Choice Solar
Completion: 
February 2013