Micro-Processor Manufacturing Facility

Chandler, Arizona

Project Description
D.P. Electric was selected by SolarCity to add the most recent 954kW PV carport/shade structure system to a micro-processor manufacturing facility campus in Chandler, AZ. The system consists of 26 individual structures and arrays connected to new 500 Kw & 300 Kw inverters, which connect to a new 1200A PV service. The interconnection required four 4” raceways with feeders to be installed up, over, and down an existing multi-story building to a point of interconnection with a pad mounted campus distribution transformer.

Size:  945 KW
Owner: 
Micro-processor Manufacturer
Contractor:
  SolarCity
Completion: 
April 2013
Attributes:
  Project coordination to reduce facility down time during installation.