Healthways Tenant Improvement

Chandler, Arizona

Project Description
D.P. Electric was selected by Ryan Companies to assist with the fast-paced electrical work for the Healthways commercial office. Healthways is a national health insurance provider. The scope of work included cabling and the design of a server room.

This was an accelerated project as a result of 3 weeks schedule time lost during the design-build phase of the project. D.P. Electric’s diligence and hard-work helped the general contractor, Ryan Companies, complete the project on time.

Size: 56,630 sf
Owner: 
CAZ 1, LLC
Contractor:
 Ryan Companies
Architect: 
Deutsch Architecture Group
Completion: 
October 2009
Unique Aspects: 
Accelerated Schedule

Equipment Installed: 2000’ linear fixtures, 8-150 kVA+ 2-45kVA transformers